Boiler
The boiler consists of two hub disks
#118 that were around bolted with
twenty-five perforated strips #1b.
For the solidity is placed into the
middle a circular girder #143. The
part that comes into the firebox is
not strips bolted. On the front of
the boiler are placed three meters
viz. a gauge-glass, a thermometer
and a manometer. The gauge-glass and
the thermometer are both made from
two handrail supports #136 and there
clenched between a axle rod #17. The
manometer is made with a flanged wheel
#20. On the top of the boiler is also
placed a safety valve that is made
by dint of two flanged wheels #20.
|